The boiler is an outdoor unit and the location is a path that has a
>slight slope of approx 1.5 degrees, about 1.5cm drop.
Can't you just put a flat base down? A little dollop of concrete suitably shuttered should level it out.
Christian.
The boiler is an outdoor unit and the location is a path that has a
>slight slope of approx 1.5 degrees, about 1.5cm drop.
Can't you just put a flat base down? A little dollop of concrete suitably shuttered should level it out.
Christian.
If it is not level:
best to get the base level. Many use a large paving flagstone as the base and pack under heath with cement.
Hello Lawrence
How difficult is it to make the base level?
Where the boiler is going is already a concrete path, if I lift the height too much bit awkward for pipework. Wall has a a line of bricks on edge.
Looks like out with the angle grinder time to remove a little bit.
I managed to speak to Grant themselves and they where unhappy even at
1.5 degrees.Cheers anyway.
Lawrence
usenet at lklyne dt co dt uk