I'm planning on installing DPC and a few courses of bricks on Monday. Should the DPC line up with the edge of the brick? In which case how to point it? Or in a few mm?
And should it be cut back to the line of the brick in the cavity, or protrude a few mm, or would that catch drips of cement from above?
George