Don't tell the buiding inspector Pt2

Dec 20, 2011 0 Replies

Well the pillock who is doing the work called me to say the the "electric towel rail" does not work in the ensuite and it blew a fuse.



I had wired every thing up and left a flex outlet plate for him to make the final connection.



I pointed out to him tonight when checking it out that he should have put some water into the towel rail.



Join the Discussion

Have something to add? Share your thoughts — no account required.

Didn't find your answer?

Ask the community — no account required