Connections to concealed knob-and-tube wiring. In cases where the existing wiring is concealed knob-and-tube, the NEC does allow it to be extended from an existing application. But that is seldom practical because the hardware is no longer readily available, and the existing knobs salvaged from old jobs have internal spacings for old Type R conductor insulation that will not work on today=92s thinner insulated conductors. Concealed knob-and-tube, as a wiring method, has no equipment grounding conductor carried with it. Over the generations, NEC provisions have changed to the point that it is almost impossible legally to wire anything without grounding it. For example, until the
1984 NEC, what is now 314.4 only required the grounding of metal boxes used with concealed knob-and-tube wiring if in contact with metal lath or metallic surfaces. Now all metal boxes must be grounded without exception.
Meanwhile, grounding has been getting more difficult to arrange to remote extensions of concealed knob-and-tube outlets. Until the 1993 NEC, you could go to a local bonded water pipe to pick up an equipment grounding connection, and then extend from there with modern wiring methods. Now 250.130(C), which governs this work, requires that the equipment grounding connection be made on the equipment grounding terminal bar of the supply panelboard, or directly to the grounding electrode system or grounding electrode conductor. You will not be inspecting grounding connections associated with concealed knob-and- tube wiring in a steel-frame building. Rather you will see this in old wood-frame buildings, probably residential. In such occupancies, even if the water supply lateral is metallic, the water piping system ceases to be considered as an electrode beyond 5 feet from the point of entry. This usually means fishing into the basement. If the contractor can fish a ground wire down to this point, he or she can fish a modern circuit up in the reverse direction and avoid the entire problem.
It is true that some geographical areas have more extensive use of slab-on-grade construction, and here interior water piping is sometimes permitted to qualify as electrodes because the pipes extend to grade for the minimum threshold distance of 10 feet, and thereby allow interior connections. But in almost every case, extensions of concealed knob-and-tube wiring do not do well upon close inspection.
In addition to the grounding issue, beginning with the 1987 NEC this wiring method cannot be used in wall or ceiling cavities that have =93loose, filled, or foamed-in-place insulating material that envelops the conductors.=94 This effectively means that such cavities cannot be insulated, because the only method of compliance involves opening all the walls to install board insulation products, and no contractor is going to keep this wiring method with the walls open. This rule is particularly controversial because, to the extent enforced in existing construction, it is a powerful economic disincentive for owners to retrofit thermal insulation.3
bud I copied and pasted because obviously you are too lazy to click on links, while you spout dis information it just adds to readers confusion.
this is just a few of the references. who wants a obsolete system that shouldnt be insulated?
few homebuyers will be interested in buying such a home.
rewiring isnt that expensive, when you consider how it increases your homes value.
besides if a homebuyer cant get homeowners insurance its a no sale...... for nearly every buyer out there.
so the seller must rewire, at that point the rewire must meet all current safety codes...............
bud you want a 100 more? or a 1000?
just to discredit you i nwill be happy to keep on posting.:)