I am fixing a leak at the90 degreee junction of a relatively flat roof and a steeper sloped roof. The flater room ends about 1 foot up from the bottom of the steeper roof, creating a small overhang.
ASCII art picture:
**************************************
- * * * ***********X *
The roof is cedar shingles.
The roofer did not put flashing at the junction and I planning on putting flashing under the overhang and at the junction of the edge of the flatter roof and the steeper roof (the X in the picture).
My question is for the metal flashing (galv metal): should I put the flashing under the roofing felt or on top of the felt? In other words, should it be: skip sheathing, flashing, felt, shinges or skip sheating, flashing, felt, shingles?
The flatter roof has a gutter at the end. I am also thinking of putting a bend flashing channel from the X junction to the start of the gutter at the end of the flatter roof.
- Phil