Hi all,
Is this okay? Beam over post.
*Using pressure treated wood*Beam is made up of 2 - 2x10x12 boards. I am using deck screws to hold it together (screwing 3 per < 16" section) I plan on using 2x Hurrican Ties to secure the each Joist to the Beam Do I need to do anything else to secure the Beam?
Another problem that I ran into is when I'm toe-nailing the Joist to the hanger, the joist seems to kick out a little. Overall it leaves a 1/8" gap between the ledger board and joist. What's the secret in keeping it snugged against the Ledger, or is that a bad thing because it won't allow the water to drain properly.
Thanx