Greetings All, I will be tiling a bathroom floor that has 3/4 t&g ply now. The plumbing has been roughed in which leaves the toilet flange on top of the plywood. My question is, since I'll be putting down 1/4 Hardiboard and then floor tile, does the flange need to be raised to sit on top of the tile or do I just leave it on the plywood? TIA to all, Mark