First big project on my own and I'm second-guessing myself. I framed a wall in my basement to help carry the main beam that runs down the middle of the house. Used 2x4s with a double top plate, toe nailed the studs every 16 inches, tied it into the floor above. Felt pretty good about it until my neighbor came by and squinted at the top plate.
He said the wall needs to be snugged up tight against the beam or it's doing nothing, just sitting there looking pretty. Problem is, my floor slab isn't perfectly level, so when I set the wall in place there's maybe a quarter inch gap at one end and it touches fine at the other. Now I don't know if I shoud be shimming between the top plate and the beam, or if the weight will settle into it over time on its own. Also wondering if it matters that the beam is slightly cambered, it curves up a tiny bit in the middle of the span. Do I shim the low ends, force the middle down somehow, or leave it? I'd rather fix it now than after the drywall goes up. What's the normal way to handle this?