Riverside Cottage 2

Right we have covered the windows:-)

Question 2 concerns Posi-joists. Anyone have any reportable experience?

I have been told they creak.

For a similar load and span, I have been told they need a deeper section than timber. But a plumber/wireman dream for easy access.

Heating designer is opposed because you can't cut a slot through the top section to return the underfloor heating pipes.

The cottage will have 3 dormers leaving a small triangular space above the eaves. I have been wondering about the practicality of keeping this space warm (inside the insulation) and using it to return the heating pipes. Sucking of teeth from engineer concerned about multiple air lock sites.

Any thoughts?

Reply to
Tim Lamb
Loading thread data ...

I used mine (triangular voids) to contain cable basket trays.

The pipes will run in front and above this space at the expense of a couple of inches of room space - and will have removable panelling for easy access to pipes and wiring.

This also solves your joists problem - run along, then drop down alongside the joist. No holes or notches.

With a sealed system, I don't see any issues (small bits of air tend to get blown through and there should not be any large amounts of air after pressurising. The plumber can add a bleeding valves at the high points to aid filling the system.

Reply to
Tim Watts

With all them 'oles in the metal web, why would you even want to cut slots?

Reply to
Andy Burns

So glad you asked that, Andy. Read the question last night and scratched my head thinking I must be missing something. Still can't see what...

Reply to
polygonum

Wet underfloor heating (Speedfit) uses aluminium spreader plates nailed to the joist tops with the pipe run trapped in pre-formed channels. The pipe has to go through or over the joist to reach the next joist pair. Going through involves a lot of pipe threading.....

Reply to
Tim Lamb

OK, I see. JG seem to recommend fixing the plates to the bottom of the flooring when using engineered joists rather than to the top of the joists ...

Reply to
Andy Burns

Sorry! Inadequate description. Heating engineer is used to dealing with conventional timber joists and his fitters expect to be able to cut a

15mm depth slot in the joist top to cross into the next joist/pair run. They nail on a *p* clip to retain the pipe.

Because this is a chalet bungalow where the internal walls upstairs are some distance in from the outer walls (joist supports) I am resisting having slots cut of any depth.

My thinking is to take the pipe under the wall and return through or over the Posi- joist. Hence lots of places where a length of pipe is able to trap air.

>
Reply to
Tim Lamb

The OP wrote "... to return the underfloor heating pipes" - I did not take that to mean the loops at the end of every joist.

Nevertheless, I cannot see any significant reason other than reducing the threading of the pipe to cut slots rather than holes in the web. And, if the layout is very simple, you could pull the pipe through all the webs at one end, then pull more and more pipe through to form the loops. Wouldn't seem to be that much of a problem.

Reply to
polygonum

Yes. Sometimes because the joist design requires the flooring to be glued down. Fit from below still needs the pipe threading through the joists and the spreader plates have to *trap* the pipe which requires more convoluted folding.

I hope to find out more this weekend; visiting someone with an installed system.

I will end up with a mix of existing timber joists at nominal 600mm spacing and new at 400mm, timber or posi. The nominal 600 is a lie because there are doubles under the dormer cheeks and partition wall as well as extras for the stair well!

Insulation has to be fitted below the spreaders which is easier from above.

>
Reply to
Tim Lamb

I've not done it but say the new upstairs lounge, 7m long, is split into

2 heating circuits (say 6 loops) that is 90m of pipe at the start!
Reply to
Tim Lamb

For a unvented (i.e. pressurised) primary heating circuit, air traps are not really much of an issue. It may make it slight harder to drain down completely, but filling is usually straight forward, even if you do have to do a second round of bleeding and topping up once the system is running.

Reply to
John Rumm

This what I was hoping to read:-)

Plenty of compressed air on farm so I could blow it out if needed.

I've not seen a Speedfit manifold but I guess you can manually close off all the circuits and fill them one at a time on full pump pressure.

Reply to
Tim Lamb

You are normally filling from mains pressure - so that soon displaces the air IME.

Reply to
John Rumm

In message , John Rumm writes

Just back from Suffolk! The underfloor heating pipes were all laid on top of insulation and not routed through or over joists.

I asked how they attached the flooring and learned the chipboard was glued at the half lap and simply laid on top of the slotted in heating pipes!

Reply to
Tim Lamb

I've heard of chip over insulation (free floating) with solid concrete underneath - but not over joists.

Reply to
Tim Watts

Our ground floor will largely be chip over pipes slotted into insulation on concrete oversite. The new bit is screed which I will tile.

Any thoughts about fitting insulation to PVC or shiplap clad dormers prior to plasterboard.

>
Reply to
Tim Lamb

Yes - make sure the chip has direct support points through to the concrete - do not just float it. What happens (every time IME) is that a) Washing machines shake the whole room; b) the insulation compresses by doorways due to constant pummelling; c) Use celotex, not jablite - it's a bit more crush resistant.

They do make special non thermal bridging support blocks for this scenario.

Personally, I prefer the screed and/or the concrete to be on top of insulation - then at least you get a solid stable floor.

Reply to
Tim Watts

Fortunately we will only have a dishwasher in the kitchen. Tumble dryer and WM are in the utility on screed. I take your point about the doorways as this has been noticed with the existing chip over jablite.

I think we are stuck with re-doing the existing for the old ground floor. To change would mean burying the timber wall panels in screed.

Reply to
Tim Lamb