Hi all,
Am going to replace and move CU. will be using longer meter tails (with a suitable switchfuse)
Now is it acceptable to route meter tails between the ground floor ceiling and the first floor floorboards?
There are already holes in joists halfway between top and bottom. joist depth is 185mm so I can run the meter tails through the existing holes.
the route is up the wall, through the ceiling - floor void then through a wall and the down to the new CU location.