Is this good or bad practice. Should I install isolation valves on the ch flow and return and the dhw in/out, about 6 inches under the boiler connections (obviously making allowances for the filling loop and it's connectors, etc).
Haven't really thought through the benefits of this, or the cons (un-nessecary restrisctions right at the start of the runs, maybe), but just thought I'd check with the group.
I'm guessing that there's no real need?
Jon