Building walls in a full (concrete basement). There are 2" drain pipes running from ceiling to floor, with very little gap between pipe and concrete wall (maybe 1/4").
How does one build a stud wall around these obstacles? I was planning on using 1" polybead (as a thermal/moisture barrier) against the concrete and a 2x4 (insulated) stud wall.
Obviously, I can't place polybead behind the 2" pipe. Any ideas on how I should proceed?
Cheers, Dave