I am about to tile the concrete floor of a boiler hut. The floor is dry
- it is on sloping ground and well drained - but reading the instructions on the bucket of tile adhesive for concrete floors, they are quite particular that the floor should have a damp course.
Is this because once the floor has impermeable tiles over it, it will get damp and the adhesive will dissolve back to a sticky state? Would I be better sticking them down with mortar?
Thanks Roger