I have an old shed which is leaning a little and might need replacing. It's powered via 2.5mm^2 (I think) SWA cable run from the garage to a CU in one corner of the shed. There's another 2.5mm^2 SWA cable running from the shed to the greenhouse. Both go through adjacent holes in floor. Demolishing the old shed would temporarily leave the CU "floating" a metre in the air, held by the SWA cables. I assume that if I had a new shed erected the SWA cables would go through holes in the floor similar to the current arrangement, but of course they'd have to be disconnected from the CU first and then reconnected.
Is removing and replacing the SWAs from the CU by the amateur straightforward (noting