horizontal thermal store

Jun 29, 2009 25 Replies

Until an explosion and no insurance claim.

Read on.....

BS-approved UDHW systems training manual, under the heading of maintenance, p40:

"the installer is responsible for the safe INSTALLATION of the unit. He/she must also make his customer aware that periodic checks of the equipment are ESSENTIAL FOR SAFETY... some manufacturers recommend a MAXIMUM of 12 months. Experience of local water conditions may indicate that MORE FREQUENT inspection is desirable."

BS6700: 1997 states that with unvented cylinders, the "maintenance and periodic easing of temperature relief valves is particularly important".

Too late all:-)

The *loft* floor has been fitted at the normal height so there really isn't space now for a store.

The long term plan for this building is to be part of an office suite (when I finally get round to sorting out the timber barn) so it might be possible to route the pipework for some future centralised ground source heat pump set up. Be a nice planning inducement, anyway:-)

Roughly 300 sq.m total floor area. Be a big collector array or a lot of pumped water!

regards

regards

Risks of explosion with an indirectly heated pressurised cylinder are to all intents nil anyway.

With an electrically heated one, the risks are greater, but still require the simultaneous failure of a number of protection mechanisms. Something it seems that many of the US examples you cite did not have.

Well that's fine. Inspect it yourself each year... especially if you are the installer.

In other news; brushing your teeth is worthwhile, report claims.

Nil? bolllox!!!!

And if not thern maybe a big booooooooom!!!

Chavs? My God!

Sorry to hear that dribble... was it another accident with your hacksaw?

Had any new tattoos this week?