Having removed a concrete Shed Base which was proud of the surrounding yard, I was looking to get the 2 x 1 m area tarmaced to match the surrounding area. However the quotes for hot tarmac of just under £500 have put me off this approach ! Using bagged Cold Lay tarmac Macadam a seems cheap alternative; is this suitable ? It will have foot traffic and the occasional vehicle wheel over it. The surrounding area is a mixture of slate, tarmac and poor concrete so a pristine cosmetic result is not required. Is there an optimal thickness to use, I can adjust the level of the hardcore and broken concrete remaining.
Cold Lay Tarmac / Macadam
May 04, 2025
Last reply: 1 year ago
2 Replies
Really Appreciate comments and opinions on Cold Lay Tarmac Macadam !!
All I know is you've got to leave it one or two days for it to harden (depending on the temperature). It contains a "cutting agent" (like kerosene) that has to evaporate for it to go hard.
Join the Discussion
Have something to add? Share your thoughts — no account required.
Didn't find your answer?
Ask the community — no account required