Grainger Transformer,3 Kva = $427 Transformers have standby and load losses to consider in making the decision. Generally, double the voltage = 1/4 the wire cost for the same loss.

Bill Kaszeta Photovoltaic Resources Int'l Tempe Arizona USA snipped-for-privacy@pvri-removethis.biz

For that load, and for that distance, a generator may be more practical. Honda are rather quiet.