I'm going to be installing about 20 feet of new 6" ducts between
2"x12" floor joists spaced 8" apart. It occurs to me that if I install the ducts one by one between the joists, I'm not going to be able to tape around them very well or put any screws in the top. What's the best way to handle this problem? Should I assemble the entire run on the floor and tape it and screw it all together and then lift it all into place in one piece?- posted
14 years ago