I am working on basement mechanicals
I need to install 6 hvac boots, 5 - 12x4 x 6" and one 4"... and few wyes8x6x6
All joist installed with 24" span .
I intend to rivet 2L shaped tin pcs something like 7x1 and attached it to each side of the boot. Should I offset those ears, by 1/2" like outlet boxes?
Thanks.