Recruitment

We have requirement of following categories for leading Dubai based Company carrying Multiplex project in Hyderabad. Current positions are for Hyderabad. Intrested candidates could send their CVs on snipped-for-privacy@indiatimes.com .

Project Managers (10), Construction and Logistics Managers (12)Sectional Managers (46)Structural Engineers (52)Structural Supervisors (84)Finishes Engineers (72) Finishes Supervisors (123)Civil Engineers (12)Civil Supervisors (24)Safety Managers (9)Safety Inspectors (50)QA/QC Managers (6)QA/QC Inspectors (50)Senior Surveyors (7)Surveyors (50)Senior Storemen (32)Storemen (18)Design and Value Engineering Managers (6)Design Coordinators (18)CAD Draughts Persons (52)Rebar Schedulers (24) MEP Managers (6)MEP Engineers (72)Senior Planners (6)Contract Administrators (6) Senior QS's (18)QS's (60)Cost Clerks (24) Measurement QS's (24)Document Controllers (30)Time Keepers (20)

Reply to
sonali10380
Loading thread data ...

Hello,

Iam and MEP Engineer having 5 plus years of experience..

Here is my CV attached with contact number.

CURRICULUM VITAE

A=2EP.K. CHAITANYA KUMAR EMAIL: snipped-for-privacy@gmail.com; B.E - MECH. snipped-for-privacy@gmail.com; MOB: 00249922783287

OBJECTIVE:

To attain a right position where my skills are utilized to the best of my ability for my personal and Organizational growth.

STRENGTHS:

Multidisciplinary expertise, creative, flexible according to the situations and good analyzing skills. =B7 Ability to work in group as well as independently with minimal supervision. =B7 Ability to learn new technologies quickly. =B7 Ability to work hard sincerely and ever ready to take responsibilities.

ACADEMIC RECORDS:

=B7 First class Graduate in Mechanical Engineering - India. =B7 Diploma in Mechanical Engineering - India.

SKILL SET:

Operating Systems: Windows 2000 AutoCAD with latest version. Microsoft Office Tools: Excel, Word, Power point. Microsoft Project.

EXPERIENCE DETAILS:

=B7 From May 2002 to Feb 2004 Worked as an Engineer in Ramoji Film City Sitara - 5star hotel, Hyderabad, India. =B7 From April 2004 to September 2005 worked as Project Engineer (Mechanical) for M/s Diplomat Engineering LLC, Sharjah, UAE. =B7 Since October 2005 till date working as a MEP Engineer for M/s Depa Interiors LLC, Abu Dhabi, UAE.

JOB PROFILE:

AS MECHANICAL ENGINEER (INDIA)

=B7 Erection of A/c Plants ( 2 x 100TR & 1 x 50TR) =B7 Installation and maintenance of AHU's & FCU's. =B7 Installation and Maintenance of Hot water boilers, Steam boilers and pumps. =B7 Part of a design team for execution of all the Plumbing and HVAC works. =B7 Coordination for all the Mechanical works execution at site.

AS PROJECT ENGINEER (UAE) =B7 Going through the drawings from the consultants / clients for quotations. =B7 Evaluation of the tender quantities. =B7 Evaluating the cost in coordination with the intermediate head. =B7 To issue the enquiries to all the vendors of specified and recommended suppliers as per the tender. =B7 Preparing the schedule of Equipment and cost of the project. =B7 Checking the submittals received from the supplier. =B7 To make a proper schedule as per the specific job requirement and getting approvals from the consultant. =B7 Designing the tonnage, plant layout for the projects. =B7 Calculating the Heat load, Duct designing. =B7 Designing of Chilled water Piping/ Refrigerant piping for the given project. =B7 Coordination with site supervisors, consultants for fluent work progress. =B7 Responsible for timely completion of the erection, installing and commissioning of the project. =B7 Coordinating for all the plumbing works at site and getting it done. =B7 Coordinating for fire systems (sprinklers, fire suppression system) at site.

AS MEP ENGINEER

The project is a 5 Star hotel on Turnkey Basis by our Abu-Dhabi Based Company in a joint venture with Investors from Sudan and Syria in Khartoum the capital city of Sudan.

The Entire basic MEP Design was done in coordination Abu-Dhabi based consultant (M/s APG consultants). =B7 Undersigned was put in charge of Execution and Redesign technically any areas in coordination with Civil and Architectural Departments, Also there were changes in the initial proposed layouts and these areas needed to be redesigned completely. =B7 The Entire works had to be studied application as per site conditions, Coordination with Architects, Contractors and Owners for their inputs. =B7 Preparation of as Built Drawings, Preparation of Handover Documentation (Manuals, Commissioning reports etc). =B7 Reporting to Finance and Project management in Abu Dhabi and onsite. Certification of Quality and Quantities for the works executing. =B7 Negotiating and finalizing Subcontractors for execution of jobs. =B7 Conducting regular meetings with sub contractors and all related departments to meet the dates committed.

The partial list of works that undersigned needed to execute as a part of day to day activities were =B7 Co ordination with Civil, Architecture for all the MEP related works. =B7 Air conditioning (4 Chillers x 400 Tr, 21 AHU's,3 FAHUs, 336 FCU's): Chillers installation and Commissioning, Chilled Water Piping (Design & Execution), Chilled water Pumps, Cooling Tower Installation with Dosing Pumps , Condenser water Pumps, Installation & Commissioning of all the CW AHU & CW FCU's, Design and Execution of Ducting System which include Cooling , Return Air , Extract, Fresh Air. =B7 Fire fighting System included : Partial Redesign and execution of Firefighting system which included but was not limited to , Installation and Commissioning of Sprinkler system, Fire Hose Cabinets, Pumps, Fire Protection Systems included Smoke detectors, Fire alarm panels and Sensors and commissioning for all the above. =B7 Security System: Installation of CCTV system completely with access control. =B7 Plumbing: Scope of work included Water supply, Storm Water Piping and Drainage Piping. Works was executed with PPR and UPVC pipes. Plumbing works also included all sanitary fittings and submersible pumps installation. =B7 Generator (3 Generators each of 1500 KVA capacity): Coordination with Supplier located in Europe, Installation, Testing and Commissioning (Synchronizing) along with trouble shooting. =B7 Electrical & Low Voltage: This included the entire coordination and execution of low voltage electrical Systems for the entire building. This also included SMATV, Telephone and Data works. =B7 Works in Addition to standard MEP works: This included execution in coordination with related agencies viz. Swimming Pool and pool plant room, Jacuzzi and steam rooms, Health Club equipments, Kitchen and Laundry equipments with Softener plant and Boilers.

PERSONAL DETAILS:

Father's Name: Ramanujam.

Nationality: Indian.

Date of Birth: 28/07/1981

Sex: Male.

Marital status: Single.

Passport Number: A7170510 Valid up to 27/01/2009.

Having worked for key aspects in an organization, I would bring a focus on quality and ease of use to system development. Furthermore, I work well with others, and I am experienced in project management.

Thank you for your consideration.

CHAITANYA KUMAR.A.P.K.

Reply to
atmakurichaitanya

HomeOwnersHub website is not affiliated with any of the manufacturers or service providers discussed here. All logos and trade names are the property of their respective owners.