Re: How level does a Boiler need to be.

The boiler is an outdoor unit and the location is a path that has a

>slight slope of approx 1.5 degrees, about 1.5cm drop.

Can't you just put a flat base down? A little dollop of concrete suitably shuttered should level it out.

Christian.

Reply to
Christian McArdle
Loading thread data ...

If it is not level:

  1. The guarantee may be void.

  1. Air locks my occur inside the boiler.

best to get the base level. Many use a large paving flagstone as the base and pack under heath with cement.

Reply to
IMM

Hello Lawrence

How difficult is it to make the base level?

Reply to
Simon Avery

Where the boiler is going is already a concrete path, if I lift the height too much bit awkward for pipework. Wall has a a line of bricks on edge.

Looks like out with the angle grinder time to remove a little bit.

I managed to speak to Grant themselves and they where unhappy even at

1.5 degrees.

Cheers anyway.

Lawrence

usenet at lklyne dt co dt uk

Reply to
Lawrence