I'm building a work shop, about 1000 sq/ft, and I'll be putting on a clay tile ('S' shape)roof as well as stuccoing the walls up to the eaves. It's going to take a while to get my tiles delivered and I know I'll be ready to stucco before they get here. Will I be setting my self up for future cracks in the stucco or may I just stucco the walls with an empty roof? If I need to wait and pre load the roof, how long do I need to have it weighted prior to doing the stucco work or the drywall work inside the shop for that matter? Thanks a bunch for any info.
- posted
18 years ago