Hi all,
After cleaning, flushing rads and pipework, installing a new Grundfos Alpha2 pump, a programmable room stat and more TRV's, I was thinking of converting to a sealed system from open vented in my 8yr old house to continue with the modernisation of the system.
The boiler is a GW Micron 50FF, which I have confirmed will be ok with a pressurised system. I have a couple of queries though and would appreciate some confirmation or correction. I have read Ed's sealed CH FAQ.
I was thinking of replacing the feed/expansion tank in the loft with the expansion vessel, feed loop and pressure valve and discharge, using the existing pipework there as there is no room in the airing cupboard for the vessel. Connecting the expansion vessel to the vent pipe and connecting the mains water feed from the tank to the water inlet via the filling loop. This will end up with the expansion vessel being plumbed before the pump. Is this all ok ??
Can I use the overflow pipe from the F/E tank to connect to the pressure relief valve as a discharge pipe? It's plastic and teminates outside via the fascia board (two storey house) overlooking our back garden.
Twelve rads and the boiler, calculating approx 10 litres for each, I scoped a 18 litre expansion vessle which would give a nice tolerance over the required capacity.
I also have one of those Aerjec things in place:
Thanks,
Jon