I just read all the replies on here. I know better than to fill the WB (wheelbarrow) to the top. I mixed some concrete for another shed by hand (with an electric mixer). I once overfilled the WB and it tipped over. What a mess !!!! I was originally going to mix this shed by hand, but since I am doing the driveway, it only ends up costing $40 more, because they charge $30 more per yard for loads smaller than 3 yards. So, by ordering 3 yards, I am saving $60 on the first two. Or, in other words, 3 yards will cost $300, two yards would cost $260. So, I will be paying about $65 for that shed floor. (With that extra quarter yard). I can barely mix it for that, and it takes a lot of work to shovel all that sand and stone and make the mix right.
Here's another idea that I got today. The shed is attached to the rear of my barn (it's a feed room). The truck can not get in the rear by the shed because the garage and some trees are in the way. However, if I close the gate to fence out my horses, the truck could drive to the front of the barn where there is a 9foot wide sliding door. I know the door is too low for the truck to enter, but their chute could come right thru the barn. They'd need a chute about
25feet long. The barn itself is 20ft wide so if they parked 2 feet from the door, ran the chute thru the barn, (at a slight angle), they could pour it right into that shed. The door comes off easily enough.Does anyone know how long the average chutes are on cement trucks?
Thanks Alvin