So after the saw horse disaster and building a new grid to set on top of the new horsed I glued the second cabinet this morning.
Half of the back face frame showing the groves to accept the plywood panels.
Left side panel in place on the same spot as previous picture.
Bottom Panel before smearing the glue
Another view of the bottom panel and side panel in place with center stile yet to be filled.
All panels and back face frame in place
Front face frame before smearing the glue
And with the front face frame in place before adding the 16 clamps.
The shelf adjustment holes center panel, lower row, and side panel, upper row. The center panel holes were not drilled through. The through holes were a result of drilling in the exact location on opposite sides of the panel. I love my new shelf pin jig, 25 holes can be drilled accurately in about 50~75 seconds. The jig will also set up for drilling drawer and door pulls.