I've been revamping a bathroom, put 15mm piping (hot & cold) up the wall for a bar shower. I was certain :-(( that I had placed them correctly, but now I come to fit the shower the pipes are about 4-5mm too far apart. Foolishly (in retrospect) I plastered over the pipes and then tiled, thinking the more secure they were the better. I can get around the pipes to a certain extent through the hole on the tile around each pipe. If I carefully remove the plaster around, and as far down as I can reach would the be enough flexibility in the pipes to close them up? Would it be sensible to use a loop of rope and tighten it like a tourniquet with a rod to draw them together? I'd better add that they terminate with a right angle joint, and at the moment project from the wall about 5cm. TIA