Hi guys,
First post although I have been reading on various subjects for a while.
I have purchased a Grohe frame which I have bolted to the wall and floor, covered in 18mm WBP ply and then tiled. I left it a day or two and then bolted the toilet on, no problem.
I have now noticed that the bottom two tiles have cracked from the pressure of the toilet bearing down (toliet anchors at the top so there is quite a lot of pressure near the U bend). I am quite heavy but obviously I cant have this happening again. Has anyone any tips on how I could do this better?
I thought I did the bolts up pretty tight (the toilet would not move by hand). Should I hav eput something between the porcelain and the ceramic tile or waited longer before sitting on it?
Any help greatfully apprecaited.
Dave