Having plyed the shower room floor I now find one section about 1 sq metre is off the level by around 4mm. Too late to level under the ply. Should I level this up with tile cement when tiling or level up before tiling with product at hand:
Floor tile adhesive, Mastercreet cement, One coat plaster