Just bought a pressure vessel and filling loop with the control manifold (with gauge) from Screwfix. The control manifold is "handed", that is it expects the mains water to arrive from the right hand side and the system connection to be on the left. (The instructions from the manufacturer of the filling loop/ control kit are ambiguous and have agreed that one of their diagrams is in error, so I assume that it should be installed the way described above).
Feed from the right, system to the left assumes that the pressure vessel is above the pipework, that is the feed is at its bottom. I compare this with another pressure vessel in another property, I see the vessel is the other way up, that is the feed is at the top.
Is there any obvious reason why I can't connect all this up with the feed into the vessel at the top. That way I can run the mains feed from the left and take the pipe to the system to the right? Naffer