I have received a quote of £250 + Materials + Labour (plus an extra day if it goes to two days) to have two slightly rippled ceilings smoothed off.
The rooms measure 3.2 x 4 metres and 1 x 3.2 metres.
Does anyone know if this is reasonable.
Thanks