We are halfway through the new DG being installed, very good job it looks too, apart from one thing....
They have sealed up all the way around the frame and under the sill, but there is a 3/8" gap between top of the sloping sill and the frame which looks rather odd. It goes back quite away under the frame.
Before I leave instructions to complain about the gap, is it normal to have that open gap?