Hi all,
As a temporary measure whilst I'm installing a new bathroom, I need to bodge a 43mm waste pipe to a 3/4" overflow pipe. I figure I can get away with this if I run the shower in short bursts so it won't get the chance to back-up. And like I say, it's only temporary. I don't suppose for one minute there's a proprietary adaptor that will do this, so how best to bodge them together?
cheers. cd