Hi all,
I've recently had my bathroom Tilled.
I waited a week before applying any fixings such as the Electric Shower and Soap dish etc
In on one of the walls I noticed that small cracks are forming in the grout. When the tiler did the work, he had it done in one day. Would it be possible that he didn't allow the Adhesive to dry be for applying the grout?
Whats the best way for this to be sorted... remove the old grout and re-do it? (do I have grounds to ask him to do this?)
Or... could I get away with filling it with a shower type silicone?
Thanks loads,
Shay