My foundations will be around 4 x 5 metres, one side by a party wall, one side by my house wall, another side 2 metres from a public sewer. The foundations near the sewer must be over 2 metres deep. The rest of them should be 1 metre. I am starting to think the best plan may be to get a company to do this work, presumably with insurance against damaging the sewer with the probably using 3 tonne digger. Any idea of the cost for this, and how much I would be paying in labour against materials. Not including the floor slab. I will still to that. Thanks, Simon.
- posted
18 years ago