Thats pretty much my way except I often tile last of all after everything is in place. I have a penchant for 'built in' basins...and pipework to them and the toilet.
If its a simple install then I accept that tiling before fitting the toilet cistern is a Good Thing. But trial fit it before tiling to make sure you have suitable bits of wood to mount it off, in stud walls anyway.
I think my toilet was in and out about three times ...once to get the pipework mostly in place, then out to get the boxing done and the floor laid, then in to check and adjust the pipework, then out to get the tiling done, then in finally. Actually I had to take it out AGAIN and redo te boxing where it foiled the downpipe..
you could leave out the skirtings if you are tiling to floor not really needed in a bathroom, I fitted the bath first then tiled then toilet and basin best possible finish and very neat