Had someone round to day to add insulation to the existing. They turned up, swore about the guy who quoted originally and left. As I pointed out, if it was easy, I'd have done it myself....
The roof has a 17.5 degree pitch, so there's basically enough space to crawl down the middle - it's 5m wide, so if you do the math, you'll find that's a a whopping 75cm clearance in the centre. Any work close to the eaves requires lying flat and inching along the 40cm span between rafters. Falling through the ceiling isn't an issue - getting stuck is! My wife says the guy who showed up was pretty tall :)
There is currently about 75mm of blown insulation. I can't get too close to the eaves, but I could push the blown stuff to the edges (and therefore increase the height) and then lay new insulation in the central space - starting at the ends, and retreating over boards as I go. I'll probably use the cheapest glass-wool style insulation and aim to go 200mm deep. Any more than that and I reckon ventilation will be somewhat limited.... The area to cover is about 50sqm, so I guess by the time I've shoved the existing blown insulation to the edges, and left a ventiliation gap, I only really need to cover 30sqm.
Anyone got any better ideas/tips?