What is UNDER flagstones on concrete? How do you keep the tops level? (Pictures)

Page 2 of 3  
On Sun, 29 Jan 2012 21:19:54 +0000 (UTC), Chuck Banshee

I would use bagged concrete for that,. Float it pout level and brush it when it is set "finger dent" hard with a corn broom to get a good surface for the mortar to bite.
Add pictures here
<% if( /^image/.test(type) ){ %>
<% } %>
<%-name%>
Add image file
Upload
Chuck Banshee wrote:

Glued? No. One sets them in mortar.

Mortar bed thick enough to let you level the top surfaces. Ever watch a block layer? Toss out mortar bed, set block, tap block to level with neighboring block, scrape off ooze out.
If your stones vary considerably in thickness, dry lay them first so you can see how much mortar you need under the thinnest. The mortar needs to be stiff enough to support them; you can cheat a bit if need be by using a couple of pebbles or whatever.

Not unsupported.

Maybe. Best to just even up the slab...dig out, add concrete. If the patch area is very long, add some dowels...drill horizontally into existing slab, insert dowels cut from rebar, pour your patch. _______________________
Regarding "How would you suggest I lay the flagstones so that one can walk along the side of the foundation?"...
You really only have two options: raise the walkway or lower the pipes. ______________________
People *do* set flags/bricks/pavers directly on the ground. People do lots of things and then wonder why what they did disintegrates. If you want a decent job, you must...
1. Remove the sod/plants/soil to a depth sufficient to accomodate 3" of compacted bed material + 1" of bedding sand + the thickness of the pavers.
2. Add bedding material. Around here, they use crushed concrete. Works well, good mix of fines and larger pieces. To get 3" compacted of that, one needs about 4 1/2". The material used varies depending on where you are. The bedding material is dumped in then raked out to flatten and provide desired slope for drainage.
3. Compact
4. Lay sand, rake and even up. The purpose of the sand is to provide a base into which irregular surfaces can settle. If what you are laying has even surfaces, you don't really need the sand *IF* the coarser bedding material has a decent surface.
5. Lay the stone
6. Compact again (to settle stone into sand)
7. Do the joints. _____________________
You might want to consider having at least the prep work done by pros. We did 1700 sq.ft. of brick in our courtyard a couple of years ago. The 3-4 man crew of Brazilians did all the prep, layed the bricks and sanded in the joints in two days. A fair amount of cutting too. The cost, exclusive of bricks but including all other materials, worked out to be $2.50 sq.ft. A bargain.
--

dadiOH
____________________________
  Click to see the full signature.
Add pictures here
<% if( /^image/.test(type) ){ %>
<% } %>
<%-name%>
Add image file
Upload
Some general comments:
1 - From the pic of where the walkway is I don't understand all the fuss in the other thread about protecting the PVC pipes against the wall. Looks like a perfect spot for some flowers, shrubs with mulch covering the pipes.
2 - As to what is holding the existing flagstones, you have what appears to be some of the material that oozed out around the edge in one pic. Chip a piece off and look at it. Normally you'd expect it to be in thinset or similar, but it could be some kind of adhesive.
3 - For the new walkway you don't need any of that. You need a stabilized base, which usually means removing any soft earth that is there, replacing it with base material which could be crushed rock or gravel. Then you put about an inch of sand or stone dust and use that to bed the flagstone. I'd put down metal edging first along the sides to give it a clean seperation from the grass.
Add pictures here
<% if( /^image/.test(type) ){ %>
<% } %>
<%-name%>
Add image file
Upload

You are planning on setting the pavers on the footing for whatever that stepped planting bed with the "water feature" in it ?
You need to know what level you will be setting the pavers at and then either add concrete to the footing so it gets closer to the finished level so you can use bedding mortar to attach the stones, or you can use pack (stonedust) material -- not sand... You would only be creating a situation where water would be likely to collect and pool under the stones at the footing which could do all sorts of terrible things over the passage of time...
Others here have said enough explaining your question about how the other flagstones are attached...
You need to rent a bigger saw, a gasoline powered cut off saw with a diamond blade which uses water to keep the dust down... You have so many cuts coming up and that small little circular saw will not last through all of them even with a diamond blade...
Sorry to say this to you but this project looks like it is adding up to something that is well beyond your skill level given the questions you have been asking about it...
Hire a professional stone mason to do it for you...
~~ Evan
Add pictures here
<% if( /^image/.test(type) ){ %>
<% } %>
<%-name%>
Add image file
Upload
On Sat, 28 Jan 2012 07:22:25 +0000 (UTC), Chuck Banshee

I have a tad over 2300 square feet of gold quartzite flagstone around my house, all set over concrete. It started as a small lanai and then a pool deck and a number of additions to that. We used Type S mortar to set them with a bit of latex additive in the mix to make things stick better
The first step is doing the puzzle. You start dry laying the stone just to figure out what the pattern is going to be. This is probably the most time consuming part but it is not time sensitive. We usually played with the stone for a week or so in a given new area before we were happy.
http://gfretwell.com/ftp/rocks4.jpg
http://gfretwell.com/electrical/addition/Doing%20the%20puzzle.jpg
If you are doing steps or some area that is critical on stone size, do that first while you still have a lot of stone to choose from. That usually eliminates having to do much cutting. We never really cut any stone. That quartzite granite is real hard to cut anyway.
Once you are happy with the layout, lay down a thick mud bed of the type S mortar and set the stone. Over the years we have developed a couple of different techniques for doing this but the best way seems to be to lay them and wipe the tops clean at the same time. You really start to get an eye for getting them level. At first we used a 4' 2x4 as a guide. Like another poster said, be sure the final level is high enough to accommodate the thickest stone.
http://gfretwell.com/electrical/addition/Mudding%20them%20in.jpg
Start in the far corner and work out to where you want to stop. Once the stone is set, any glaze of mortar on the stone will come off with a pressure cleaner. It does get a lot better with time. They will always look dirty when you first do it but the mortar glaze goes away.
Don't mind the snake
http://gfretwell.com/wildlife/Scarlet%20snake.jpg
Add pictures here
<% if( /^image/.test(type) ){ %>
<% } %>
<%-name%>
Add image file
Upload
On Sat, 28 Jan 2012 15:35:41 -0500, gfretwell wrote:

You're right!
It took me almost the entire day (Saturday) to do this step!
It's bad enough that I mostly have small well broken pieces to deal with.
Luckily, both the steel diamond saw and the brown-material masonry saw easily cut the flagstone (although the diamond saw seems to cut twice as fast). Both dust up terribly!
Here is a picture of the stones very roughly laid out (without any cutting).

The puzzle is driving me CRAZY! (being ocd)
In addition ... I'm not sure if you cut the last edge (the outside) edge last or if I cut all the edges before setting them in concrete.
Either way, my plan is to cut them to fit today.
Add pictures here
<% if( /^image/.test(type) ){ %>
<% } %>
<%-name%>
Add image file
Upload
On Sun, 29 Jan 2012 21:09:48 +0000 (UTC), Chuck Banshee

Use a wet saw. The water keeps the dust down considerably. BTW, why are you cutting them at all?
Add pictures here
<% if( /^image/.test(type) ){ %>
<% } %>
<%-name%>
Add image file
Upload
On Sun, 29 Jan 2012 19:06:55 -0500, snipped-for-privacy@att.bizzzzzzzzzzzz wrote:

While that's great advice, I don't have a helper to spray a hose on the diamond saw, nor a wet saw apparatus - so - for this (my first concrete & flagstone job) - it's going to have to be done dusty! :)
And, I understand why many are saying NOT to cut the stones, but this picture should show why I must cut all the edges of the stones to match the existing water feature:

BTW, I noticed water seeping out of the concrete of the water feature (see the picture for details).
Is that water leak easily repairable while I'm working on this project?
Add pictures here
<% if( /^image/.test(type) ){ %>
<% } %>
<%-name%>
Add image file
Upload
On Mon, 30 Jan 2012 09:09:19 +0000 (UTC), Chuck Banshee

When I cut concrete, I just propped the hose up between a couple of blocks to flood the area I was cutting. I have a wet saw for this sort of work, though. It needs a new motor, though. :-(

I see, though be careful that the edges don't overhang. Even then, they'll likely crack and pieces splinter off over time.

Add pictures here
<% if( /^image/.test(type) ){ %>
<% } %>
<%-name%>
Add image file
Upload
On Mon, 30 Jan 2012 23:43:14 -0500, snipped-for-privacy@att.bizzzzzzzzzzzz wrote:

The water is coming from the little fish pond behind the concrete wall. I never noticed the seepage until now. I wonder if my digging disturbed something.
Add pictures here
<% if( /^image/.test(type) ){ %>
<% } %>
<%-name%>
Add image file
Upload
On Tue, 31 Jan 2012 14:30:29 +0000 (UTC), Chuck Banshee

You should be able to get some rubber/vinly paint sort of stuff they use on pools. Maybe even a vinyl liner for the pond.
Add pictures here
<% if( /^image/.test(type) ){ %>
<% } %>
<%-name%>
Add image file
Upload
On Tue, 31 Jan 2012 21:52:34 -0500, snipped-for-privacy@att.bizzzzzzzzzzzz wrote:

I was thinking of patching it up with 'hydraulic cement' but if painting it with special paint works - that's what I'll do.
Only later. I haven't had a chance to work on it since Monday unfortunately - so there's no progress to report.
The bags of mortar & concrete are getting wet by the day being outside in the dew so I'd better hurry.
Add pictures here
<% if( /^image/.test(type) ){ %>
<% } %>
<%-name%>
Add image file
Upload
On Wed, 1 Feb 2012 06:00:03 +0000 (UTC), Chuck Banshee

If you have a crack big enough to put the cement into, do that first. If they're tiny cracks (likely) then hydraulic cement won't help.

Put a tarp over them or put them in garbage bags.
Add pictures here
<% if( /^image/.test(type) ){ %>
<% } %>
<%-name%>
Add image file
Upload
On Sun, 29 Jan 2012 21:09:48 +0000 (UTC), Chuck Banshee

We always get the dry fit first. You really want a natural edge showing and cut the parts that will be in the mud. If you do end up with a cut edge, use a brick hammer to chip up the edge a little to get the natural look back. The quartzite granite we use is so hard it just laughs at a diamond blade. You can get through it but it is painfully slow. The fiber blades just smoke and wear away.
Add pictures here
<% if( /^image/.test(type) ){ %>
<% } %>
<%-name%>
Add image file
Upload
On Sun, 29 Jan 2012 23:14:08 -0500, gfretwell wrote:

Today I thought I'd finish the job (my first ever with concrete and my first ever with flagstones) - but - alas - I only got six of about 18 flagstones cut. Sigh.
And, while laying them out uncut was certainly a good idea, it turns out that I just couldn't fully process mentally the myriad permutations and combinations inherent in that process. So, for example, three stones I 'thought' would fit perfectly, didn't fit.
So I had to remove them all anyway and start over (many times). Here's a picture of just one permutation of the uncut flagstones:

I also learned that there's a LOT of leaning over with BOTH hands on the heavy stones and you can't get around that (because there is a wall in front of you). The best you can do is put a towel on your head to protect it as you lean against the wall and use both hands on the stone.
Here's a picture of the cut stones.
If anyone knows whether that last (outside) edge cut is supposed to be cut BEFORE or AFTER the flagstones are laid in concrete, it would be helpful if you can let me know (before I make the final call on that).
Thanks for all your help! - The hardest part is the dry jigsaw-puzzle and the cutting choices - Given very few usable stones to work with doesn't help the matter - Tomorrow, I hope, to finish the dry cutting - and then mortar them in!
Add pictures here
<% if( /^image/.test(type) ){ %>
<% } %>
<%-name%>
Add image file
Upload
Chuck Banshee wrote:

If you want the outside edge of the stones to be flush with the outside vertical wall, you would be hard put to cut them after laying without screwing up the wall.
If I were doing it and wanted that edge to be straight, I would...
1. Dry lay the stones. Note that the inside edge need not be chock-a-block to the pond wall (IMO)
2. Draw a line on the underneath front edge of the stone, number the stones sequentially on the top.
2a. If you think you'd have trouble getting the stones back where they belong, mark the edges of the stones on the vertical walls.
3. Cut all the stones on the line you marked
4. Lay the stones aligning the front (outside) edge with the wall.
--

dadiOH
____________________________
  Click to see the full signature.
Add pictures here
<% if( /^image/.test(type) ){ %>
<% } %>
<%-name%>
Add image file
Upload
On Mon, 30 Jan 2012 07:16:31 -0500, dadiOH wrote:

I'm confused.
I thank you for the description - but I don't understand as you 'seem' to be talking about cutting the edge near the wall. Please allow me to clarify (in case I explained it wrong).
The edge near the vertical wall is already cut. So are the side-to-side edges (next to each block).
The edge I'm unsure about is the edge that eventually ends up in the grass. That's what I'm calling the outside edge.
Here's a picture, taken just now at first light, that has the edge that I was asking about pointed to.

I am not sure if it's best to cut that pencil line (which cuts the length of each stone to exactly fifteen 1/2 inches away from the wall) BEFORE or AFTER I set the stones in cement & mortar???
(Note: Unless suggested otherwise, I plan on cutting that line AFTER I lay the stones permanently. That way, the outside (cut) line will always be straight. I plan on snapping a chalk line where the pencil marks now are and then slicing it with the circular saw & diamond blade.)
But I've never done this ... so that's why I ask. It just seems too hard to get that outside edge straight any other way.
Add pictures here
<% if( /^image/.test(type) ){ %>
<% } %>
<%-name%>
Add image file
Upload
On Mon, 30 Jan 2012 13:41:30 -0500, dadiOH wrote:

It was my fault for confusing all the terms (cement, mortar, concrete, etc.).
This half of the flagstone walkway already has an old 'concrete' base (which I found unexpectedly when I dug up the lawn). So, all I will be doing is putting 'mortar' on top of the concrete, about an inch (or so) thick.
Then I will lay the flagstones in that bed of mortar and I will fill the half-inch in between each stone with that same mortar.
Since the flagstones are of varying thicknesses, I will tap them with a rubber mallet and use a level to level them off.
Then, after it all sets (a day or two later), my plan is to snap a chalk line and then saw off the outside edge as shown in the previous picture:

The reason for sawing AFTER (and not before) is that I am hoping to get a straighter edge than if I tried to even up each and every flagstone while I am setting them in mortar.
Is this plan 'normal' to saw the ends off last?
Add pictures here
<% if( /^image/.test(type) ){ %>
<% } %>
<%-name%>
Add image file
Upload
Chuck Banshee wrote:

The concrete was under the lawn? Be SURE to clean it well before you lay anything. I hesitate to mention it but hydrochloric acid (muriatic acid) works well for that. A dilute solution...and note that one adds acid to the water, NEVER the reverse.
--

dadiOH
____________________________
  Click to see the full signature.
Add pictures here
<% if( /^image/.test(type) ){ %>
<% } %>
<%-name%>
Add image file
Upload
On Mon, 30 Jan 2012 15:45:51 -0500, dadiOH wrote:

Yes. So were the sprinkler heads.
This picture has an arrow where the concrete is now - and where the soil line was before I dug it all out.


Hmmm... I can get hydrochloric acid but why would it need cleaning with acid if it's just dirt?
Add pictures here
<% if( /^image/.test(type) ){ %>
<% } %>
<%-name%>
Add image file
Upload