Hi,
I'm in the middle of remodeling one of the bathrooms on the second floor and the subfloor had to be cut to re-route some plumbing. I see a hollow space about 8 inches deep between the first floor celing (kitchen) and the second floor baseboard. Is there anything I can do now to add value to the project before I close this hole (Add insulation, etc)?
thanks