My final quote is as follows:
- Install 90-100 4x8 sheets of drywall
- Tape and mud all joints
- Skim coat ceiling and walls
- Sand ceiling and walls
- Prime walls with p.v.a drywall primer - 1 coat
Footnotes: Ceiling to be smooth (not textured). All areas to be completely skimmed on last coat. Homeowner to scrap out job.
$2693.72 (includes tax)
What do you think?