In order to replace a section of cast iron sewer pipe below grade, I had to cut open my concrete slab. The cut is about 10 feet long and two feet wide. I was fairly certain the pipe was directly underneath so I started to dig, and dig, and dig. I dug about four feet of soil and still no pipe, so I started to dig sideways, and eventually found the pipe about 18" off from where I thought it would be. It means the pipe is not directly under the slab cut, but 18" inside of it. I had to dig a "cave"about 2' inside and under the slab to work on replacing and repairing the pipe, and I have completed the repair.
Now I have a big hole, about 10 feet long, 4 feet wide (2 feet is cut open 2 feet is "tunneled inward", and 4 feet deep). Since I am in South Florida my soil is mostly sand. I pushed the sand back into the big hole but it is difficult to fill up the tunneled part. I used a 4x4 to pact it sideways as much as I can, and when I filled up the hole, I still have about three cubic feet of soil left. I then used a garden hose to wet the soil to compact it., and as much as I compacted the soil sideways under the "tunnel", as soon as I point the garden hose at it. the sand quiclkly erode away and I can feel the hose with water a foot or more into the tunnel, indicating there are cavities and air pockets. So I dug the sand back out to a depth of 8" or so, and pushed the soil sideways again. I repeated this process a few times to try and compact the sand in the tunnel, but it does not seem to be packed enough like it was. Should I worry about this? Will there be any issues with that part of the slab unsupported? Are there any tricks to get it really packed?
Thanks in advance,
MC