I decided to install basement bathroom.
Installed new basin, run 3" PVC pipe for toilet, tub, sink drains ensured 1/4" slope per foot, filled with water no leaks everything is a OK. Ready to concrete
Oh wait, there is a leak, where 3" pipe enters basin...
So question would be how should I sealed pipe that enter sewage pit?
( I know if pump is working water level should never get that high, and yet I feel need to seal...)