my electrician has given me a steep bill for second fix. It's a 2 storey extension with garden room on the g/floor + small utility room and shower room, 7 wall mounted outsdide light tails, then 2 beds upstairs + landing. The first fix was =A31500 35hrs @ =A332ph- electrician + 'apprentice' son. The second fix he wants =A31600 for =A337hrs @ =A325- (him only son now no longer around)
Leaving aside the materials the labour hours seem high for 2nd fix. Does this sound right or does 2nd fix normally take as long??