The fill around my culvert which sits under a concrete drive is eroding. It is happening because the drainage ditch has not been dug out by my subdivision in about 10 years. How do I go about making sure it is repacked well and that I make sure it is filled completely so it doesn't cause extensive damage to the driveway? Of course I am fighting the homeowner assoc to come dig the ditch so the water doesn't get forced above and around the culvert as I am situated next to a large feeder underground ditch that pushes the water to a nearby rentention pond. I would like to concrete the sides walls too when I finish repacking it.
- posted
8 years ago